We share all project applications to encourage public participation in our decision-making process. Notices are automatically generated for most applications that we receive. On this page, you can search for applications based on company, location, project type, application number, resource, date, or other keyword. For a small number of applications, a notice is manually prepared. These notices are on the Notices page.
Applications are typically available for public review for 30 days, or an otherwise specified timeframe. If you believe that you may be directly and adversely affected by a proposed project, you can submit a statement of concern within this timeframe.
Following our review of an application, we share our decision on our Publication of Decisions page.
To receive an application to amend a previously authorized Water Licence.
35-055-20W5MApplication under the provisions of the Pipeline Act to amend an existing licence for a LVP Products pipeline with 0 mol\kmol hydrogen sulphide (H2S).
35-023-01W5M,26-023-01W5MApplication under the provisions of the Pipeline Act to amend an existing licence for a LVP Products pipeline with 0 mol\kmol hydrogen sulphide (H2S).
35-023-01W5M,26-023-01W5MApplication under the provisions of the Oil and Gas Conservation Act to amend the details of Licence 0518716 which was issued to construct and operate a a crude oil production with a maximum hydrogen sulphide (H2S) concentration of 0 mol/kmol in the following location(s):
14-049-01W4MApplication under the provisions of the Oil and Gas Conservation Act to construct and operate a gas production well well with a maximum hydrogen sulphide (H2S) concentration of 0 mol/kmol in the following location(s):
25-041-11W5MApplication under the provisions of the Pipeline Act to amend an existing licence for an Oil-Well Effluent pipeline with 44 mol\kmol hydrogen sulphide (H2S).
20-018-02W5MTo receive an application for a Water Act temporary diversion licence for Drilling And Horizontal Hydraulic Fracturing Completion.
28-038-06W5MApplication under the provisions of the Pipeline Act to amend an existing licence for a Natural Gas pipeline with 0 mol\kmol hydrogen sulphide (H2S).
22-054-07W4MApplication under the provisions of the Pipeline Act to amend an existing licence for a Natural Gas pipeline with 0.45 mol\kmol hydrogen sulphide (H2S).
23-047-05W4MAdvantage Energy Ltd. has applied under the provisions of the Public Lands Act for a NEW AER Temporary Field Authorization for the purpose of Pipeline, Fresh Water.
36-076-13W6M,35-076-13W6M,14-077-13W6M,11-077-13W6M,02-077-13W6M